DC fast charging station at Idukki Dam Park, Kerala
Photo · Timothy A. Gonsalves · CC BY-SA 4.0
Most popular

DC 60 kW dual-gun

The workhorse of Indian public charging. Two guns with load sharing means you serve two cars without doubling your connection.

24 Indian manufacturers build this

30 to 120 kW CCS2 chargers for public sites, petrol pumps and highway stops. We introduce you to the ones that fit your site, and they quote you directly — specification, order size and site works move the number too much for a list price to mean anything.

Power output60 kW
ConnectorCCS2 × 2
Guns2
SupplyThree phase
CurrentUp to 150 A DC
Charge time35–45 minutes to 80%
Cable5 m × 2, CCS2
ProtectionIP54
ProtocolOCPP 1.6J or higher
Warranty2 years on power modules

Booking opens WhatsApp with this model already filled in. Free for buyers — vendors pay us, you don't.

Is this the right charger for you?

The workhorse of Indian public charging, and what most petrol pumps, highway sites and hotels end up buying. Two guns with dynamic load sharing means you serve two cars without paying for two connections — when one car charges it gets the full 60 kW, when two are plugged in they split it.

Vehicles

All CCS2 cars; 20–80% in about 40 minutes on a 40 kWh battery.

What installation needs

Three-phase, around 70 kW of sanctioned load, a foundation and ideally a canopy.

Before you sign anything

  • Confirm your current sanctioned load from your latest electricity bill
  • Ask whether the quote includes the transformer upgrade, or excludes it
  • Get OCPP 1.6J or higher stated in writing, so you are not locked to one vendor's software
  • Check ARAI or equivalent certification and exactly what the warranty covers
  • Ask for the monthly fixed cost — demand charges and platform commission, not just capex

The rest of the project cost

The DC 60 kW dual-gun is one line. These are the others, and they are where first-time buyers get caught out.

What a 60 kW DC station costs you beyond the equipment, India, 2026
What you are paying for Low High Why it moves
Civil work, canopy, foundation, cabling ₹1.5 L ₹3.0 L Higher if you want weather protection and lighting, which you should.
Transformer or sanctioned load upgrade ₹1.0 L ₹4.0 L The single most common budget shock. Depends entirely on your existing feeder.
DISCOM commercial connection, deposits, liaisoning ₹0.50 L ₹2.0 L Security deposit scales with sanctioned load and is refundable but ties up cash.
Network software, signage, commissioning, first-year AMC ₹0.40 L ₹1.5 L Platform commission on every unit sold is separate and ongoing.
Site works, before equipment ₹3.4 L ₹10.5 L Add the manufacturer's equipment quote to this. Compare the total, never the hardware alone.

DC 60 kW dual-gun questions

Who manufactures a DC 60 kW dual-gun in India?

24 Indian manufacturers build this class of charger, including Exicom Tele-Systems, Delta Electronics India, Servotech Power Systems, ABB India and others. Pricing varies by specification, order quantity and how much site work your location needs, so the manufacturer quotes you directly rather than from a list price. Tell us about your site and we make the introduction.

What does a DC 60 kW dual-gun need to be installed?

Three-phase, around 70 kW of sanctioned load, a foundation and ideally a canopy. A three-phase connection is required.

Which cars work with a DC 60 kW dual-gun?

All CCS2 cars; 20–80% in about 40 minutes on a 40 kWh battery. The connector is CCS2 × 2, which is the standard in India.

What is OCPP and why does it matter?

OCPP is the open protocol that lets a charger talk to any management platform, and insisting on OCPP 1.6J or higher is what stops you being locked to one vendor. A non-OCPP charger can only be managed by its manufacturer's software, so if you ever want to switch networks, change pricing logic, or join an aggregator app, you cannot. It costs nothing extra to specify. Ask for it in writing.

What hidden costs should I expect beyond the charger price?

Four things that vendors routinely quote separately or not at all: the transformer or sanctioned load upgrade, the DISCOM security deposit, demand charges on your monthly bill, and platform commission on every unit you sell. Demand charges in particular catch people out — a commercial connection bills you on your peak sanctioned demand whether you use it or not, so an underutilised 120 kW connection bleeds money every month. Always compare landed cost and monthly fixed cost, never just hardware price.