Jamnagar, Gujarat — distribution by PGVCL.
Setting up an EV charging station in Jamnagar
Photo by Shagil Kannur, CC BY-SA 4.0
A 60 kW dual-gun DC station in Jamnagar costs roughly ₹9 to 19 lakh all-in. Your local distribution utility is PGVCL (Paschim Gujarat Vij Company Ltd), commercial power runs ₹7.4–8.8 per unit, and public DC charging retails locally at around ₹17–21 per unit.
Dwarka pilgrimage traffic makes the Jamnagar–Dwarka route one of the more interesting under-served highway charging corridors in Gujarat.
We collect your requirement once, verify it on a call, and send the identical brief to vendors who actually work in Jamnagar — so the quotes you get back are comparable on landed cost rather than on hardware price.
Planning a charging site in Jamnagar?
We already know your utility and your local tariff — they go in the message. Just tell us what kind of site it is.
Send on WhatsAppOpens a chat on +91 77788 04214. Nothing is stored here — you press send. Free for buyers: manufacturers pay us when a deal closes.
Your message
The local numbers that decide your project
National averages are useless when you are deciding on one site. These are the figures that actually move your payback in Jamnagar.
- Distribution utility
- PGVCL (Paschim Gujarat Vij Company Ltd)
- Commercial tariff per unit
- ₹7.4–8.8
- Public DC charging retail rate
- ₹17–21
- Solar yield, if you add an array
- 1570 units/kW/yr
- Areas with the strongest demand
- Park Colony · Indira Marg · Summair Club Road · Pandit Nehru Marg
- Highway and arterial corridors
- NH-27 Rajkot–Jamnagar · Jamnagar–Dwarka route · Jamnagar–Porbandar road
Getting your connection from PGVCL (Paschim Gujarat Vij Company Ltd)
PGVCL area with unusually strong industrial infrastructure because of the refinery complex, though that capacity is not always available to small commercial consumers.
Whatever your utility, the sequence is the same: check your existing sanctioned load from your latest bill, apply for a commercial connection at the load your charger needs on top of that, and find out early whether the local feeder or distribution transformer can carry it. Where it cannot, you pay for the upgrade — and that is the line item that turns a ₹10 lakh project into a ₹15 lakh one.
What the full cost looks like
The charger is the number every vendor shows you. The other four lines are where first-time buyers in Jamnagar lose ₹2–5 lakh they had not planned for.
| What you are paying for | Low | High | Why it moves |
|---|---|---|---|
| Civil work, canopy, foundation, cabling | ₹1.5 L | ₹3.0 L | Higher if you want weather protection and lighting, which you should. |
| Transformer or sanctioned load upgrade | ₹1.0 L | ₹4.0 L | The single most common budget shock. Depends entirely on your existing feeder. |
| DISCOM commercial connection, deposits, liaisoning | ₹0.50 L | ₹2.0 L | Security deposit scales with sanctioned load and is refundable but ties up cash. |
| Network software, signage, commissioning, first-year AMC | ₹0.40 L | ₹1.5 L | Platform commission on every unit sold is separate and ongoing. |
| Site works, before equipment | ₹3.4 L | ₹10.5 L | Add the manufacturer's equipment quote to this. Compare the total, never the hardware alone. |
Model a station in Jamnagar
Set your electricity cost to the ₹7.4–8.8 band and your selling price within the ₹17–21 local range, then be honest about cars per day.
Indicative only, and deliberately includes the costs vendor calculators leave out. It excludes rent, staff, GST treatment and your DISCOM's specific demand-charge structure.
Indicative planning numbers. Real figures depend on your roof structure, shading, your state's net-metering terms and your sanctioned load.
Solar yields 1570 units per kW here
Brass parts cluster and allied manufacturing with the highest irradiance figures in the state. Payback here is typically the fastest of any Gujarat city we model.
Since a charging station's main cost is the electricity it buys, and both projects need the same site survey and load study, Jamnagar sites frequently do better installing both at once than a year apart.
Where charging demand is in Jamnagar
- Park Colony
- Indira Marg
- Summair Club Road
- Pandit Nehru Marg
Corridors
- NH-27 Rajkot–Jamnagar
- Jamnagar–Dwarka route
- Jamnagar–Porbandar road
EV charging questions, answered for Jamnagar
How much does an EV charging station cost in Jamnagar?
A 60 kW dual-gun DC station in Jamnagar costs roughly ₹9–19 lakh all-in — ₹6–10 lakh for the charger and the rest for civil work, a transformer or sanctioned-load upgrade, and the commercial connection from PGVCL (Paschim Gujarat Vij Company Ltd). Your position on that range depends almost entirely on whether your site's existing feeder can carry the extra load.
Which electricity board handles EV charging connections in Jamnagar?
PGVCL (Paschim Gujarat Vij Company Ltd). PGVCL area with unusually strong industrial infrastructure because of the refinery complex, though that capacity is not always available to small commercial consumers.
What is the commercial electricity tariff in Jamnagar?
Commercial consumers in Jamnagar typically pay ₹7.4–8.8 per unit, and public DC fast charging retails locally at around ₹17–21 per unit. That spread is your gross margin before demand charges and platform commission. Confirm your own slab from your latest bill, since tariffs vary by consumer category and sanctioned load.
Is Jamnagar a good location for a charging station?
Dwarka pilgrimage traffic makes the Jamnagar–Dwarka route one of the more interesting under-served highway charging corridors in Gujarat.
Do I need a licence to open an EV charging station in India?
No licence is required. The Ministry of Power has explicitly de-licensed EV charging — operating a public charging station is not a regulated activity, so you do not need a power trading or distribution licence. You do need a commercial electricity connection from your DISCOM with adequate sanctioned load, and your installation must meet CEA safety standards and local electrical inspectorate approval. GST registration applies to the service revenue.
How long does it take to get an EV charging station running?
Six to twelve weeks if your electrical infrastructure is already adequate, and three to six months if it is not. The charger itself arrives in two to four weeks. What sets your timeline is the DISCOM: a commercial connection on an existing adequate feeder can be sanctioned in three to four weeks, while a transformer upgrade or new feeder can take three months or more depending on your utility.
Get Jamnagar quotes
Vendors who actually serve Jamnagar, quoting against the same brief. Free for buyers, and we will tell you if your site does not work.
Call +91 77788 04214 or message us on WhatsApp.
Planning a charging site in Jamnagar?
We already know your utility and your local tariff — they go in the message. Just tell us what kind of site it is.